Page 89 - FINAL-book ประมวลกฎหมาย เกี่ยวกับการจัดซื้อจัดจ้างและการบริหารพัสดุ(แก้ไขครั้งที่15)
P. 89

40


                            Section 81.  A selection method shall be for design or construction supervision
             work, whereby solicitation is made by a State agency to at least three service providers possessing

             qualifications determined by the State agency for tendering proposals, except that there exist less
             than three service providers possessing the determined qualifications for such particular work. In
             this regard, it shall be permissible in the following cases:

                            (1)  a  general  solicitation notification  method  has been  used  but  no one  has
             tendered a proposal or the proposals have not been selected;
                            (2) it is a work which is complicated or very complicated;

                            (3) it is a work involving designs or ideas such as structure models, as to which a
             State agency has insufficient information for setting preliminary details;
                            (4) other cases as prescribed in the Ministerial Regulation.


                            Section 82.  A specific method shall be for design or construction supervision work,
             whereby a State agency elects to hire a particular service provider whose proficiency has been

             known or witnessed at the recommendation of the committee in charge of procuring the design
             or construction supervision work by a specific method. In this regard, it shall be permissible in the

             following cases:
                            (1) both a general solicitation notification method and a selection method have
             been used, or a selection method has been used, but no one has tendered a proposal or the
             proposals have not been selected;

                            (2) it is the work of which the cost estimate for the construction does not exceed
             that prescribed in the Ministerial Regulation;

                            (3) it is the work in respect of which there arises an urgent need or which is related
             to national security, where delay may prejudice the State agency or national security;
                            (4) it is the work which, by technical reasons, needs to be performed by the original

             service provider in furtherance of the work previously performed;
                            (5) other cases as prescribed in the Ministerial Regulation.


                            Section 83.  A design competition method shall be for design or construction
             supervision work, whereby solicitation is made by a State agency to service providers possessing


             DISCLAIMER: THIS  TEXT HAS  BEEN PROVIDED  FOR  EDUCATIONAL/  COMPREHENSION PURPOSES  AND

             CONTAINS  NO LEGAL  AUTHORITY.  THE  OFFICE  OF THE  COUNCIL OF  STATE  SHALL  ASSUME  NO
             RESPONSIBILITY FOR ANY LIABILITIES ARISING FROM THE USE AND/OR REFERENCE OF THIS TEXT. THE

             ORIGINAL THAI TEXT AS FORMALLY ADOPTED AND PUBLISHED SHALL IN ALL EVENTS REMAIN THE SOLE
             AUTHORITY HAVING LEGAL FORCE.






                                                           89
   84   85   86   87   88   89   90   91   92   93   94